Description:

The New Maintenance Hangar 6 will be a two-bay hangar for the maintenance of the CC-177 Globemaster III Fleet and CC-150 Polaris Aircraft, the clear height in both hangar bays is approximately 23 meters. The total project value for this 18,244 square meter maintenance hangar is $82.3 million and comprises the aircraft bays, administration offices and warehouse space.

Mechanical scope consists of supply and installation of boilers, in-floor heating system, compressed air system, exhaust fans, waste fluid transfer & storage system, air handling units, energy recovery units, humidifiers, chillers, ductless split system, plumbing fixtures and all pipe and duct work including insulation and controls.