PROJECT : Design BuildLeedTransit Facilities

Back

GO Transit – Brampton Bus Storage & Maintenance Facilities

Description:

The project consisted of design-build construction of approximately 70,000 sq ft LEED Silver storage and maintenance facility for Metrolinx GO Transit.

The mechanical scope included plumbing piping and drainage, rain water harvesting with filters for grey water supply for urinals and W/C flushing, in-floor heating in the maintenance and storage areas, snow melt system, complete HVAC system, tail pipe exhaust, process piping for multiple fluids c/w storage tanks, geothermal heat pump system for heating and cooling, boilers, pumps, building automation system, commissioning and client training.

Client:
Consultant: MCW Consultants Ltd.
Contract Type:
Completion: October 2010