311 Jarvis St / 354 George St – Court House

Cedarbrae District Branch Library

The project included additions and renovations to the existing Cedarbrae Library with an overall area of approximately 32,000 sq ft. New areas included updated washroom facilities, library book storage areas, adult, teen and children lounge areas, work rooms, quiet study areas, new entry vestibule and entry hall. The renovated facility was also made fully handicap

S. Walter Stewart Library

The project involved the addition and renovations to the 26,000 sq ft library for the Toronto Public Library. The mechanical scope included supply and installation of plumbing sanitary, storm and domestic piping systems, replacement and refurbishment of existing air handling units and a complete new HVAC distribution system comprising of rooftop units, hydronic heating and

Burlington Centennial Pool Revitalization

This renovation project consisted of upgrading the pool deck, viewing areas and change rooms at Burlington Centennial Pool. Dependable Mechanical Systems worked as the mechanical contractor on the project to upgrade the building’s heating and cooling system, insulation, plumbing & drainage and controls. The project was completed within timelines and budgets and the quality of

Mountainside Arena & Pool Revitalization

Revitalization of the Mountainside Recreation Centre began last summer and includes pool renovation, renewal of the arena, addition of a new lobby and two new community rooms. Dependable Mechanical Systems scope is to supply & install HVAC equipment, heat recovery units, dehumidifier unit, plumbing & drainage, insulation and controls. The project is scheduled to be

Tansley Woods Community Centre

Dependable Mechanical Systems was awarded this project in May 2014 for Electrical and Mechanical upgrades in one the busiest community centres in Burlington. The project includes full lighting upgrades, heat pump change over, custom made air handling units, boiler upgrade, plumbing, duct work, insulation and controls.

Mayfield Recreation Complex

A Town Of Caledon project for the supply and installation of dehumidifier unit, air-conditioning roof top units and heat recovery units at Mayfield Recreational Centre. DMS is the General Contractor on this project and the scope of work includes roof work, electrical work, HVAC & plumbing, T bar & ceiling, renovations in the pool area,