PROJECT : Medical

Back

Kipling Acres Redevelopment – Phase 2

Description:

Construction of a new 145 bed addition to this existing City of Toronto Long Term Care Facility on a 41,000 sq m lot. The mechanical scope includes supply and installation of hot water perimeter heating using runtal radiators and radiant in-floor heating, roof top air handling units with humidifiers, an air cooled chiller system, a domestic hot water heating system, plumbing fixtures and all pipe and duct work including insulation and controls.

Client:
Consultant: Crossey Engineering Ltd.
Contract Type:
Completion: In Progress